Workers of Sekondi-Takoradi PTC interchange have embarked on strike to demand better conditions of service.
Clad in red bands and attire, the workers were seen hanging around the construction site without any meaningful work.
Vice President Dr Mahamudu Bawumia in September 2020, cut the sod for the construction of the first three-tier interchange in Takoradi, to ease traffic flow considerably and shorten travel time for commuters.
This was in fulfillment of the New Patriotic Party (NPP) 2016 campaign promise to provide the Metropolis with better road networks.
The strike they say is a way of registering their displeasure over the conditions under which they are working and demand better.
- Over 50% of persons in 23 districts multidimensionally poor – GSS
- Residents of Berekum New Biadan appeal for evacuation of refuse site
- Asthmatic level 200 law student dies ‘strangely’ at Ewim Polyclinic, family suspects foul play
- We will not vote in 2024 if Adusuazo-Takinta road is not fixed - Residents to Akufo-Addo
- Fuel tanker catches fire at Ayensukrom No.2
- Read all related articles